Posts Tagged ‘Oroville’

The “greedy” strategy for SWP and CVP reservoir operations

Posted by: Deirdre Des Jardins on May 1, 2021

The State Water Project was originally designed for a six year drought

Posted by: Deirdre Des Jardins on April 26, 2021